Contractor quote comparison worksheet
| Line | Quote A | Quote B | Quote C |
|---|---|---|---|
| Who | |||
| Contractor name | ______________ | ______________ | ______________ |
| Licence number, and where and when you verified it | ______________ | ______________ | ______________ |
| Insurance certificate received, and verified with the insurer on | ______________ | ______________ | ______________ |
| Quote date, and date the price is valid until | ______________ | ______________ | ______________ |
| Scope | |||
| Approach: repair and restore cap, replace cap, or new wall | ______________ | ______________ | ______________ |
| Linear feet included | ______________ | ______________ | ______________ |
| Finished cap elevation, with datum | ______________ | ______________ | ______________ |
| Survey the elevation is based on, and its date | ______________ | ______________ | ______________ |
| Engineering and sealed plans included | ______________ | ______________ | ______________ |
| Demolition and disposal included | ______________ | ______________ | ______________ |
| Anchors: number, type, spacing (tie-backs or deadmen) | ______________ | ______________ | ______________ |
| Drainage: weep holes and filter fabric | ______________ | ______________ | ______________ |
| Riprap at the toe | ______________ | ______________ | ______________ |
| Commonly excluded | |||
| Permit fees and any bonds | ______________ | ______________ | ______________ |
| Surveys: as-built, bathymetric, geotechnical | ______________ | ______________ | ______________ |
| Benthic survey | ______________ | ______________ | ______________ |
| Mitigation: seagrass, coral, riprap relocation | ______________ | ______________ | ______________ |
| Electrical and plumbing: dock power, water, lights | ______________ | ______________ | ______________ |
| Restoration: landscaping, pavers, irrigation | ______________ | ______________ | ______________ |
| Money and terms | |||
| Unit price, extra linear foot of cap | ______________ | ______________ | ______________ |
| Unit price, extra anchor | ______________ | ______________ | ______________ |
| Unit price, extra pile or panel | ______________ | ______________ | ______________ |
| Unit price, fill per cubic yard | ______________ | ______________ | ______________ |
| Payment schedule: signing, mobilisation, milestones, completion | ______________ | ______________ | ______________ |
| Lien releases provided with each payment | ______________ | ______________ | ______________ |
| Warranty: length, and workmanship or materials or both | ______________ | ______________ | ______________ |
| Start date and expected duration | ______________ | ______________ | ______________ |
| Total quoted | ______________ | ______________ | ______________ |
| Total once the exclusions above are added | ______________ | ______________ | ______________ |
This is a template, not legal advice. Have an attorney review anything you sign or send in a dispute.
From walldockdeck.com/free/templates/contractor-quote-comparison/