Boca Raton lets emergency repairs go ahead first, but the permit application must reach the building official before the close of business of the next business day. On a hurricane warning, construction sites must remove or tie down debris and materials, and owners may board up non-impact openings without a permit if the panels come down within 10 days.
Source: City of Boca Raton Code of Ordinances Secs. 14-18, 19-68, 19-100, 19-170 (Municode); Florida Building Code, Building, 8th Ed. (2023) s. 105.2.1 (ICC codes.iccsafe.org) · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Palm Beach County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.