Yes. Boca Raton requires a city permit to install or replace a seawall, and no bulkhead or retaining wall may be built in city waters until Development Services approves the plans. Before the cap is poured, a zoning location survey of the wall face, property line and piles must be inspected, and a final engineer's report with the cap elevation closes the job.
Source: City of Boca Raton Code Secs. 19-66, 22-31, 22-35 (Supp. 72 Upd. 1); Seawalls and Marine Structures page; s. 403.813(1)(e), 161.053, 553.79 F.S. (2026); r. 62-330.051, 18-21.005 F.A.C.; 33 CFR 322.3(a); PBC ERM Permitting and Regulation page · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Palm Beach County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.