Aventura leaves dock reach largely discretionary: there is no fixed length for private waterways. The Community Development Department sizes each dock case by case from the waterway's width, with a hard ceiling of 15 ft of protrusion onto public property. Miami-Dade County environmental staff and the drainage district must also sign off before construction.
Source: City of Aventura Code Sec. 31-238(m) (section history through Ord. 2017-07); Miami-Dade County Code Secs. 24-48.1(1)(a), 24-48.3(1)(j),(3); Fla. Stat. 403.813(1)(b) (2026); 33 CFR 322.3(a) · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Miami-Dade County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.