West Palm Beach requires boat lifts to be designed by a registered professional engineer and installed in the middle one-third of the lot as extended into the waterway, along with the dock, tees, dolphins and pilings. Lifts are one of the few things allowed to stand above a dock. The building permit application needs sealed plans and written DEP, Army Corps and/or SFWMD approval.
Source: City of West Palm Beach Zoning and Land Development Regulations Sec. 94-313 (enCodePlus; Ord. 4935-21); s. 403.813(1)(s), F.S. (2026); 33 CFR 322.3(a) · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Palm Beach County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.