Yes. The Town of Palm Beach's building official issues bulkhead and seawall permits, and building permits carry a condition that all state and federal permits be obtained before work starts. Oceanfront walls must reach 14.34 ft NGVD, lower walls must be raised when the property is developed, and every seawall needs an engineer's recertification every 15 years.
Source: Town of Palm Beach Code Secs. 50-72, 62-37 to 62-39, 62-75 to 62-77, 66-177 (Supp. 30 Upd. 1); Application for Construction Permit; s. 403.813(1)(e), 161.053, 553.79 F.S. (2026); r. 62-330.051, 18-21.005 F.A.C.; 33 CFR 322.3(a); PBC ERM Permitting and Regulation page · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Palm Beach County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.