Yes. Key Colony Beach requires a city building permit from the building official before any seawall construction, issued only after the Army Corps, Florida DEP or other required state and federal agencies approve. Seawalls must be vertical, new walls must match the height of the walls they join, and anyone bringing water-borne construction equipment into the city must first post a $50,000 bond.
Source: Key Colony Beach Code Secs. 5-30, 5-51, 5-54, 5-60, 5-61, 5-62 (Supp. 36); s. 403.813(1)(e), F.S. (2026); 33 CFR 322.3(a) · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Monroe County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.