Juno Beach's permit FAQ says to create an MGO Customer Portal account and register as a contractor with the Town; only once the account is verified and the registration done can permits be applied for. Inspections are booked in MGO Connect, and inspectors take text messages only for a two-hour window request.
Source: Town of Juno Beach Permits FAQ (QID 65); Code Sec. 28-19; PBC Contractor Regulations page; Regulated Trades / Standards for Certified Categories (rev. 7/1/25); BCAB preemption notice (1/21/2026); F.S. 489.105, 489.126, 489.141, 489.1425, 489.143, 440.02, 440.05, 501.021, 501.025, 205.065 (2026); Fla. Admin. Code R. 61G4-15.100; DBPR Construction Industry page and Verify a Licensee; DFS Division of Workers' Compensation construction exemption page and data portal · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Palm Beach County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.