Juno Beach amends the Florida Building Code to require 18 inches above base flood elevation instead of the state's 1 foot, for both homes and other buildings. It also counts improvements over ten years, from the first permit after 1 June 1993. Six extra inches over the statewide minimum applies to residential and commercial projects alike.
Source: Juno Beach Code of Ordinances Ch. 7 Floodplain Regulations, Secs. 7-12, 7-21 (Ord. Nos. 687, 769); FEMA Community Status Book, Florida (www.fema.gov/cis/FL.html, report 10/03/2026); 2023 Florida Building Code, Residential R322.2.1, R322.3.2; 44 CFR 59.1; FEMA Flood Map Service Center · Verified 2026-10
The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.
Available for the cities whose rule we have verified and sourced.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.
What applies across Palm Beach County, and where each city departs from it.
The rule changes at the city line, not the county line.
What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.
A screening sheet for owners, not an engineering inspection.
Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.