What are the boat lift rules in Dania Beach?

Allowed; submersible lift 25% / 15 ftguide pole required

Dania Beach caps how far a submersible boat-lifting device may extend: 25% of the waterway width and never more than 15 feet, unless the planning and zoning board grants a variance and a guide pole is fitted. Lifts need a building department permit, and no permanent or temporary boat covering is allowed in the setback or over a public waterway.

Source: City of Dania Beach Land Development Code Art. 240, Sec. 240-20 (Supp. 163; Ord. 2010-20, 2012-025); Broward County Code Sec. 27-336 (Supp. 72); s. 403.813(1)(s), F.S. (2026); 33 CFR 322.3(a) · Verified 2026-10

The detail

ReachNo extension of a boat-lifting device capable of being submerged may extend more than 25% of the waterway width, not to exceed 15 feet, unless a variance is granted by the planning and zoning board and a guide pole is attached - LDC Sec. 240-20(K)
Guide poleAt least 1.5 inches in diameter, permanently attached, vertical, at least 6 feet above the water at all times, with a reflective colour - Sec. 240-20(K)
PermitA building department permit is required before erecting docks, boat davits, hoists or similar mooring structures; on navigable waters every regulating authority must approve, and the applicant must own the land or have written consent - Sec. 240-20(I)
CoversNo boathouse, permanent covering or temporary covering for a boat within the zoning setback area, or within or over any public waterway - Sec. 240-20(H)
Principal building firstBoat slips and docks only where a principal building exists - Sec. 240-20(A)
Projection contextDocks may extend 5 feet beyond the property line, or where the waterway is wider than 50 feet, 10% of the width up to 20 feet - Sec. 240-20(B)
Dock heightA dock deck may not exceed 3 feet above mean high tide unless the adjacent ground is higher, in which case it may match the average ground level at the seawall - LDC Sec. 240-20(D)
On the dockNo cooking, sleeping or business activity on a dock - Sec. 240-20(L)
Unsafe structuresThe community development department inspects mooring structures; owners get 30 days' written notice to correct unsafe ones - Sec. 240-20(J)
Broward CountyBoatlifts and davits are listed among the projects that qualify for a county general environmental resource license, which the code says is issued within ten days of a complete application - Broward County Code Sec. 27-336(a)(1)f.
State and federalFloating boat lifts and floating vessel platforms that meet s. 403.813(1)(s), F.S. (they float at all times, hold the vessel out of the water, and either sit inside a previously permitted slip or total no more than 500 sq ft - 200 sq ft in Outstanding Florida Waters - beside a qualifying dock or bulkhead) need no state permit; a local government may then ask only for a one-time registration unless the platform is attached to a bulkhead with no dock. Structures in navigable waters otherwise need Army Corps authorization unless exempt or under a general permit - 33 CFR 322.3(a).

Your city's height sheet

The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.

Available for the cities whose rule we have verified and sourced.

Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.

The county rule behind this

What applies across Broward County, and where each city departs from it.

The same question, nearby

The rule changes at the city line, not the county line.

Other questions about Dania Beach

Twelve signs a seawall is failing

What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.

A screening sheet for owners, not an engineering inspection.

Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.