WallDockDeck
Bay Harbor Islands · Miami-Dade County

How high does a seawall have to be in Bay Harbor Islands?

5.50ft MSL (mean sea level); optional up to 6.0 ft MSL on listed bay-facing lots

The top of any seawall cap must be at 5.50 ft above mean sea level. Certain lots facing Biscayne Bay wave action may choose to go up to 6.0 ft above MSL. The code uses MSL, not NAVD88 or NGVD29.

Source: Bay Harbor Islands Code of Ordinances Sec. 23-12(10)(c), (d), (g), (h) (Municode Supp. 10 Upd. 2) · Verified 2026-10

The detail

Required heightElevation at top of any seawall cap shall be 5.50 ft above MSL - Bay Harbor Islands Code Sec. 23-12(10)(c)
Optional higher capLots 11-29 Blk 2; Lots 1-4 Blk 3; Lots 1-5 Blk 4; Lots 29-95 Blk 23; Tracts C-F (PB 46 Pg 5) may elect 6.0 ft above MSL - Sec. 23-12(10)(c)
ApprovalNo seawall may be erected, constructed or repaired without written Town approval - Sec. 23-12(10)
DesignDesigned and certified by a registered engineer, built by licensed contractor - Sec. 23-12(10)(d)
Older low wallsExisting seawalls built another way may stay as non-conforming structures and may continue to be repaired; the town strongly encourages raising them to the subsection (c) height and removing failed tie-backs - Sec. 23-12(10)(h)
How it must be builtReinforced concrete with a cap beam on concrete pilings driven to bedrock; rip-rap cannot replace a seawall, and all existing tie-backs come out when a wall is replaced - Sec. 23-12(10)(g)

Your city's height sheet

The elevation your city requires, the datum it is measured in, and the section of code that says so. One page.

Available for the cities whose rule we have verified and sourced.

Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.

The county rule behind this

What applies across Miami-Dade County, and where each city departs from it.

The same question, nearby

The rule changes at the city line, not the county line.

Other questions about Bay Harbor Islands

Twelve signs a seawall is failing

What to look for, where to look for it, and what it means when you find it. Walk your wall in twenty minutes.

A screening sheet for owners, not an engineering inspection.

Done — it is on the way to your inbox. Not there in a minute? Check your Promotions or Spam folder, and move it to your inbox so the next ones arrive.